Slowly making headway, life is busy, here are some pics.
Sump is cleaned up and in place.
Pump is rebuilt and ready for action.
Fabbed a filter sock compartment.
Reconnecting the hot water heat.
Went with 2 Modular Marine ghost overflows with 1" bulkheads.
A shot from the front.